A free tool from DUDA

How long does a move in Milan last?

Simulate a time interval using required volume, floors, accesses and operations. The result is to prepare the comparison with DUDA: the actual duration is verified with the site visit.

Prepare your summary

Adjustable simulation hypotheses

Loading and unloading: total minutes-person per m3, departed between operators. The scales increase the handling of 18% per medium level; the routes over 15 m add 0.4% per total meter. Dismantling and reassembly: 35–65 minutes-person for standard mobile; boxes: 4–7 minutes-person each. Initial journey and preparation are added to the team's time. These are working hypotheses, to be checked with DUDA.

The data and photos remain on your device. Save the project to keep it. The summary is added to the DUDA request only if you choose to continue and then send it.

Your result

Fill out the data and press “Calculate the duration”.

For PDF choose A4 in the print window and “Save as PDF”.

How to use the estimate

Use the volume of assets that must actually start. Consider separately the furniture to disassemble and the boxes you want to prepare for the team. Indicates if the elevator is really usable: the only presence in the building is not enough.

The simulation does not reconstruct traffic in real time. Enter the planned journey between the two addresses and describe any difficult access to DUDA. Kitchens, pianos, safes, vehicles elevators and special machining require a specific evaluation.

The duration is the organization of the work. For labor you can use the Cost calculator; to arrange team and program you can request a free site visit.